Friday, August 1, 2008

Day One


Day one and we are making good progress. These workers must be high on red bull or have a lot of pent up frustration. haha. They have taken down the wall between Bedroom 3 and the master bedroom, taken off all the bathroom fittings (tiles and floor tiles as well), demolished the entire kitchen cabinet (taken off all the wall and floor tiles too) and removed the flooring for the whole apartment. All these were done in a stupendous speed! Well done, boys. At this rate, moving in next month is very possible.

Our common bathroom naked without tiles or fittings.
Our empty kitchen. It looks like a cave.
Our master bathroom with just a tap.
The combined master bedroom and bedroom 3 without the wall in between. This will be our new master bedroom.